[AR] Re: new Glenn mockup

  • From: "Troy Prideaux" <troy@xxxxxxxxxxxxxxxxxxxxx>
  • To: <arocket@xxxxxxxxxxxxx>
  • Date: Thu, 11 Nov 2021 13:20:59 +1100

Maybe it’s the persuasive talents of those wretched managers brought up and 
baptised on the holy scriptures of those Dinospace Training Manuals :P

 

https://futurism.com/the-byte/jeff-bezos-copy-elon-musk

 

Troy

 

From: arocket-bounce@xxxxxxxxxxxxx [mailto:arocket-bounce@xxxxxxxxxxxxx] On ;
Behalf Of James Fackert
Sent: Thursday, 11 November 2021 12:42 PM
To: arocket list <arocket@xxxxxxxxxxxxx>
Subject: [AR] Re: new Glenn mockup

 

Gradatim Ferociter.

 

...trying to figure out where ferociousness fits into the Blue picture.  The 
step by step part, fits, and as Henry pointed out, this is a useful step to 
testy ground support equipment.

If you are still engineering with 20th century development tools.

If you were engineering with 21st century tools, you would know when you 
designed the carriers erectors etc. that they would fit and manage the loads, 
and there would not be much risk in using a real flight article for the first 
real fitting. And you would be ready for first flight a decade sooner.... But 
that would require flight ready engines which seem to be an issue for blue as 
well.  And a second stage in a similar state of readiness.

 

How do you say "at a snails pace" in Latin?

Per Escargoum?

 

On Wed, Nov 10, 2021, 8:05 PM FreeLists Mailing List Manager 
<ecartis@xxxxxxxxxxxxx <mailto:ecartis@xxxxxxxxxxxxx> > wrote:

arocket Digest  Wed, 10 Nov 2021        Volume: 09  Issue: 245

In This Issue:
                [AR] Re: new Glenn mockup
                [AR] Re: new Glenn mockup
                [AR] Re: New Glen mock-up.
                [AR] Re: New Glen mock-up.
                [AR] Re: New Glen mock-up.
                [AR] Re: New Glen mock-up.
                [AR] Re: New Glen mock-up.
                [AR] Re: New Glen mock-up.

----------------------------------------------------------------------

From: James Fackert <jimfackert@xxxxxxxxx <mailto:jimfackert@xxxxxxxxx> >
Date: Tue, 9 Nov 2021 21:53:17 -0500
Subject: [AR] Re: new Glenn mockup

Pretty massively huge empty shell of the first stage only...
Progress, though!
On Tue, Nov 9, 2021, 8:05 PM FreeLists Mailing List Manager <
ecartis@xxxxxxxxxxxxx <mailto:ecartis@xxxxxxxxxxxxx> > wrote:

arocket Digest  Tue, 09 Nov 2021        Volume: 09  Issue: 244

In This Issue:
                [AR] New Glen mock-up.

----------------------------------------------------------------------

From: Anthony Cesaroni <anthony@xxxxxxxxxxx <mailto:anthony@xxxxxxxxxxx> >
Subject: [AR] New Glen mock-up.
Date: Tue, 9 Nov 2021 02:53:41 +0000


https://www.geekwire.com/2021/blue-origin-practices-dummy-version-new-glenn-orbital-rocket-florida/
Anthony J. Cesaroni
President/CEO
Cesaroni Technology/Cesaroni Aerospace
http://www.cesaronitech.com/
(941) 360-3100 x1004 Sarasota
(905) 887-2370 x222 Toronto



------------------------------

End of arocket Digest V9 #244
*****************************





------------------------------

Date: Wed, 10 Nov 2021 05:51:50 -0500
From: Ed Kelleher <Pres@xxxxxxxxxxxxx <mailto:Pres@xxxxxxxxxxxxx> >
Subject: [AR] Re: new Glenn mockup

Sidetrack
At 09:53 PM 11/9/2021, you wrote:
Pretty massively huge empty shell of the first stage only...
Progress, though!

On Tue, Nov 9, 2021, 8:05 PM FreeLists Mailing List Manager 
<<mailto:ecartis@xxxxxxxxxxxxx ;<mailto:ecartis@xxxxxxxxxxxxx
ecartis@xxxxxxxxxxxxx <mailto:ecartis@xxxxxxxxxxxxx> > wrote:
arocket Digest  Tue, 09 Nov 2021  Â  Â  Â  Volume: 09  Issue: 244

In This Issue:
  Â  Â  Â  Â  Â  Â  Â  [AR] New Glen mock-up.

----------------------------------------------------------------------

From: Anthony Cesaroni <<mailto:anthony@xxxxxxxxxxx ;
<mailto:anthony@xxxxxxxxxxx> >anthony@xxxxxxxxxxx <mailto:anthony@xxxxxxxxxxx

Subject: [AR] New Glen mock-up.
Date: Tue, 9 Nov 2021 02:53:41 +0000

<https://www.geekwire.com/2021/blue-origin-practices-dummy-version-new-glenn-orbital-rocket-florida/>https://www.geekwire.com/2021/blue-origin-practices-dummy-version-new-glenn-orbital-rocket-florida/
Anthony J. Cesaroni
President/CEO
Cesaroni Technology/Cesaroni Aerospace
<http://www.cesaronitech.com/>http://www.cesaronitech.com/
(941) 360-3100 x1004 Sarasota
(905) 887-2370 x222 Toronto



------------------------------

End of arocket Digest V9 #244
*****************************



------------------------------

From: roxanna Mason <rocketmaster.ken@xxxxxxxxx 
<mailto:rocketmaster.ken@xxxxxxxxx> >
Date: Wed, 10 Nov 2021 03:45:43 -0800
Subject: [AR] Re: New Glen mock-up.

It's a moral booster not rocket,
Otherwise a waste of money,
Ken

On Mon, Nov 8, 2021 at 6:53 PM Anthony Cesaroni <anthony@xxxxxxxxxxx 
<mailto:anthony@xxxxxxxxxxx> > wrote:


https://www.geekwire.com/2021/blue-origin-practices-dummy-version-new-glenn-orbital-rocket-florida/



Anthony J. Cesaroni

President/CEO

Cesaroni Technology/Cesaroni Aerospace

http://www.cesaronitech.com/

(941) 360-3100 x1004 Sarasota

(905) 887-2370 x222 Toronto






------------------------------

Subject: [AR] Re: New Glen mock-up.
From: Henry Vanderbilt <hvanderbilt@xxxxxxxxxxxxxx 
<mailto:hvanderbilt@xxxxxxxxxxxxxx> >
Date: Wed, 10 Nov 2021 09:15:16 -0700

I haven't been following New Glenn closely - I've had distractions - but 
it seems obvious to me that IF this "dummy version" was built using some 
of the same manufacturing processes and tooling as the flight vehicle - 
I'd guess so from the photo but don't know - it's a very useful workup 
for the production team, a chance to practice and get up to speed on 
building the main structures where minor mistakes are not critical and 
easily corrected.
And if as seems very likely it has been built to the same dimensions and 
specs as the flight first stage (and presumably had mass added to 
accurately simulate the missing bits, engines, tanks etc) then it's also 
a very useful workout/debugger tool for the (necessarily substantial) 
ground handling arrangements for the flight boosters, again with much 
less worry about making and correcting minor mistakes.

IOW, they only have to learn to avoid ONE flight-booster destroying 
error with this test piece for it to more than pay for itself.  Not so?

Henry

On 11/10/2021 4:45 AM, roxanna Mason wrote:
It's a moral booster not rocket,
Otherwise a waste of money,

Ken

On Mon, Nov 8, 2021 at 6:53 PM Anthony Cesaroni <anthony@xxxxxxxxxxx 
<mailto:anthony@xxxxxxxxxxx>  
<mailto:anthony@xxxxxxxxxxx ;<mailto:anthony@xxxxxxxxxxx> >> wrote:

    
https://www.geekwire.com/2021/blue-origin-practices-dummy-version-new-glenn-orbital-rocket-florida/
    
<https://www.geekwire.com/2021/blue-origin-practices-dummy-version-new-glenn-orbital-rocket-florida/>

    Anthony J. Cesaroni

    President/CEO

    Cesaroni Technology/Cesaroni Aerospace

    http://www.cesaronitech.com/ ;<http://www.cesaronitech.com/>

    (941) 360-3100 x1004 Sarasota

    (905) 887-2370 x222 Toronto





------------------------------

From: Matthew JL <prmattjl@xxxxxxxxx <mailto:prmattjl@xxxxxxxxx> >
Date: Wed, 10 Nov 2021 11:57:11 -0500
Subject: [AR] Re: New Glen mock-up.

Structural outer mold line pathfinders have been the norm since Saturn.
Important for testing pad fitment, transportation procedures, tooling,
etc.  I don’t get why this is catching flack.
Best,
-Matt L.

On Wed, Nov 10, 2021 at 11:15 AM Henry Vanderbilt <
hvanderbilt@xxxxxxxxxxxxxx <mailto:hvanderbilt@xxxxxxxxxxxxxx> > wrote:

I haven't been following New Glenn closely - I've had distractions - but
it seems obvious to me that IF this "dummy version" was built using some of
the same manufacturing processes and tooling as the flight vehicle - I'd
guess so from the photo but don't know - it's a very useful workup for the
production team, a chance to practice and get up to speed on building the
main structures where minor mistakes are not critical and easily corrected.

And if as seems very likely it has been built to the same dimensions and
specs as the flight first stage (and presumably had mass added to
accurately simulate the missing bits, engines, tanks etc) then it's also a
very useful workout/debugger tool for the (necessarily substantial) ground
handling arrangements for the flight boosters, again with much less worry
about making and correcting minor mistakes.

IOW, they only have to learn to avoid ONE flight-booster destroying error
with this test piece for it to more than pay for itself.  Not so?


Henry

On 11/10/2021 4:45 AM, roxanna Mason wrote:

It's a moral booster not rocket,
Otherwise a waste of money,

Ken

On Mon, Nov 8, 2021 at 6:53 PM Anthony Cesaroni <anthony@xxxxxxxxxxx 
<mailto:anthony@xxxxxxxxxxx> >
wrote:


https://www.geekwire.com/2021/blue-origin-practices-dummy-version-new-glenn-orbital-rocket-florida/



Anthony J. Cesaroni

President/CEO

Cesaroni Technology/Cesaroni Aerospace

http://www.cesaronitech.com/

(941) 360-3100 x1004 Sarasota

(905) 887-2370 x222 Toronto







------------------------------

From: "J. Cameron Cooper" <jccooper@xxxxxxxxx <mailto:jccooper@xxxxxxxxx> >
Date: Wed, 10 Nov 2021 11:00:39 -0600
Subject: [AR] Re: New Glen mock-up.

While I believe they have some stuff made with real tooling, this in
particular is a steel boilerplate version made by a local steel fab shop.
It's destined for ground handling tests and practice:
https://twitter.com/blueorigin/status/1457793865100902402?s=20
On Wed, Nov 10, 2021 at 10:15 AM Henry Vanderbilt <
hvanderbilt@xxxxxxxxxxxxxx <mailto:hvanderbilt@xxxxxxxxxxxxxx> > wrote:

I haven't been following New Glenn closely - I've had distractions - but
it seems obvious to me that IF this "dummy version" was built using some of
the same manufacturing processes and tooling as the flight vehicle - I'd
guess so from the photo but don't know - it's a very useful workup for the
production team, a chance to practice and get up to speed on building the
main structures where minor mistakes are not critical and easily corrected.

And if as seems very likely it has been built to the same dimensions and
specs as the flight first stage (and presumably had mass added to
accurately simulate the missing bits, engines, tanks etc) then it's also a
very useful workout/debugger tool for the (necessarily substantial) ground
handling arrangements for the flight boosters, again with much less worry
about making and correcting minor mistakes.

IOW, they only have to learn to avoid ONE flight-booster destroying error
with this test piece for it to more than pay for itself.  Not so?

Henry

On 11/10/2021 4:45 AM, roxanna Mason wrote:

It's a moral booster not rocket,
Otherwise a waste of money,

Ken

On Mon, Nov 8, 2021 at 6:53 PM Anthony Cesaroni <anthony@xxxxxxxxxxx 
<mailto:anthony@xxxxxxxxxxx> >
wrote:


https://www.geekwire.com/2021/blue-origin-practices-dummy-version-new-glenn-orbital-rocket-florida/



Anthony J. Cesaroni

President/CEO

Cesaroni Technology/Cesaroni Aerospace

http://www.cesaronitech.com/

(941) 360-3100 x1004 Sarasota

(905) 887-2370 x222 Toronto






-- 
J Cameron Cooper
jccooper@xxxxxxxxx <mailto:jccooper@xxxxxxxxx
jccooper@xxxxxxxxxxxxxxxxx <mailto:jccooper@xxxxxxxxxxxxxxxxx>  
<anything@xxxxxxxxxxxxxxxxxx <mailto:anything@xxxxxxxxxxxxxxxxxx> >



------------------------------

From: roxanna Mason <rocketmaster.ken@xxxxxxxxx 
<mailto:rocketmaster.ken@xxxxxxxxx> >
Date: Wed, 10 Nov 2021 09:50:53 -0800
Subject: [AR] Re: New Glen mock-up.

It's the term "mock-up" that's the issue. That implies to me it's not made
of or by flight article materials or manufacturing processes.
When Rocketdyne built that F-1 mock up back in the 60's it looked so
cheezy and fake all covered in silver paint over plywood.
Silver painted wood vs Inconel brazed together with Nioro, no comparison.
Ken

On Wed, Nov 10, 2021 at 8:57 AM Matthew JL <prmattjl@xxxxxxxxx 
<mailto:prmattjl@xxxxxxxxx> > wrote:

Structural outer mold line pathfinders have been the norm since Saturn.
Important for testing pad fitment, transportation procedures, tooling,
etc.  I don’t get why this is catching flack.

Best,
-Matt L.

On Wed, Nov 10, 2021 at 11:15 AM Henry Vanderbilt <
hvanderbilt@xxxxxxxxxxxxxx <mailto:hvanderbilt@xxxxxxxxxxxxxx> > wrote:

I haven't been following New Glenn closely - I've had distractions - but
it seems obvious to me that IF this "dummy version" was built using some of
the same manufacturing processes and tooling as the flight vehicle - I'd
guess so from the photo but don't know - it's a very useful workup for the
production team, a chance to practice and get up to speed on building the
main structures where minor mistakes are not critical and easily corrected.

And if as seems very likely it has been built to the same dimensions and
specs as the flight first stage (and presumably had mass added to
accurately simulate the missing bits, engines, tanks etc) then it's also a
very useful workout/debugger tool for the (necessarily substantial) ground
handling arrangements for the flight boosters, again with much less worry
about making and correcting minor mistakes.

IOW, they only have to learn to avoid ONE flight-booster destroying error
with this test piece for it to more than pay for itself.  Not so?


Henry

On 11/10/2021 4:45 AM, roxanna Mason wrote:

It's a moral booster not rocket,
Otherwise a waste of money,

Ken

On Mon, Nov 8, 2021 at 6:53 PM Anthony Cesaroni <anthony@xxxxxxxxxxx 
<mailto:anthony@xxxxxxxxxxx> >
wrote:


https://www.geekwire.com/2021/blue-origin-practices-dummy-version-new-glenn-orbital-rocket-florida/



Anthony J. Cesaroni

President/CEO

Cesaroni Technology/Cesaroni Aerospace

http://www.cesaronitech.com/

(941) 360-3100 x1004 Sarasota

(905) 887-2370 x222 Toronto







------------------------------

From: "John Dom" <johndom@xxxxxxxxx <mailto:johndom@xxxxxxxxx> >
Subject: [AR] Re: New Glen mock-up.
Date: Wed, 10 Nov 2021 20:09:14 +0100

Interesting: who was paying for the dummy contration launch pictured ? The 
conical â€œmissile† shape  reminds of the Sprint ABM of the 70-ies: 
http://www.nuclearabms.info/Sprint.html
During the nineties centrifugal launching was discussed briefly on AR. 
Considered as a principle for space travel taking off from the lunar surface 
f.i. or from some asteroid. 

Dismissed only because of the bang of it hitting the atmosphere? Still, the 
idea requires no propellant when considered as a first stage.

To make it to space or as an IBM, some chemical multi stage propulsion payload 
would be still be required. So it was said then.



In those days liear light gas expansion tubes (not guns really) were also 
tested for pneumatic launch. Not sufficiently powerful without a few rocket 
stages to make it to orbit or ICBM interception.

Only an explosive gas compressor is necessary as most of the decompressed gas 
could’ve been re-used after compression. On the lunar surface… Re-used, not 
vented.



John 





From: arocket-bounce@xxxxxxxxxxxxx [mailto:arocket-bounce@xxxxxxxxxxxxx ;
<mailto:arocket-bounce@xxxxxxxxxxxxx> ] On Behalf Of J. Cameron Cooper
Sent: woensdag 10 november 2021 18:01
To: arocket@xxxxxxxxxxxxx <mailto:arocket@xxxxxxxxxxxxx
Subject: [AR] Re: New Glen mock-up.



While I believe they have some stuff made with real tooling, this in particular 
is a steel boilerplate version made by a local steel fab shop. It's destined 
for ground handling tests and practice: 
https://twitter.com/blueorigin/status/1457793865100902402?s ;



On Wed, Nov 10, 2021 at 10:15 AM Henry Vanderbilt <hvanderbilt@xxxxxxxxxxxxxx 
<mailto:hvanderbilt@xxxxxxxxxxxxxx> > wrote:

I haven't been following New Glenn closely - I've had distractions - but it 
seems obvious to me that IF this "dummy version" was built using some of the 
same manufacturing processes and tooling as the flight vehicle - I'd guess so 
from the photo but don't know - it's a very useful workup for the production 
team, a chance to practice and get up to speed on building the main structures 
where minor mistakes are not critical and easily corrected.

And if as seems very likely it has been built to the same dimensions and specs 
as the flight first stage (and presumably had mass added to accurately simulate 
the missing bits, engines, tanks etc) then it's also a very useful 
workout/debugger tool for the (necessarily substantial) ground handling 
arrangements for the flight boosters, again with much less worry about making 
and correcting minor mistakes.

IOW, they only have to learn to avoid ONE flight-booster destroying error with 
this test piece for it to more than pay for itself.  Not so?

Henry

On 11/10/2021 4:45 AM, roxanna Mason wrote:

It's a moral booster not rocket, 

Otherwise a waste of money,



Ken



On Mon, Nov 8, 2021 at 6:53 PM Anthony Cesaroni <anthony@xxxxxxxxxxx 
<mailto:anthony@xxxxxxxxxxx> > wrote:

https://www.geekwire.com/2021/blue-origin-practices-dummy-version-new-glenn-orbital-rocket-florida/



Anthony J. Cesaroni

President/CEO

Cesaroni Technology/Cesaroni Aerospace

 <http://www.cesaronitech.com/http://www.cesaronitech.com/

(941) 360-3100 x1004 Sarasota

(905) 887-2370 x222 Toronto







-- 

J Cameron Cooper
jccooper@xxxxxxxxx <mailto:jccooper@xxxxxxxxx
jccooper@xxxxxxxxxxxxxxxxx <mailto:jccooper@xxxxxxxxxxxxxxxxx>  
<mailto:anything@xxxxxxxxxxxxxxxxxx ;<mailto:anything@xxxxxxxxxxxxxxxxxx> > 



------------------------------

End of arocket Digest V9 #245
*****************************

Other related posts: