[AR] Re: big rockets

  • From: "Troy Prideaux" <troy@xxxxxxxxxxxxxxxxxxxxx>
  • To: <arocket@xxxxxxxxxxxxx>
  • Date: Thu, 7 Oct 2021 14:09:16 +1100

Ian,

I didn't read it so much as a dig at what JPL have done, more a heads up
(minus any pleasantries) of what's to come ie. a serious disruption to the
way things are done- just like what the rest of us have experienced over the
last 5 or 10 years. JPL, will adapt and likely produce even cooler stuff for
a cheaper price.

 

Troy

 

From: arocket-bounce@xxxxxxxxxxxxx [mailto:arocket-bounce@xxxxxxxxxxxxx] On
Behalf Of Ian M. Garcia
Sent: Thursday, 7 October 2021 2:00 PM
To: arocket@xxxxxxxxxxxxx
Subject: [AR] Re: big rockets

 

That's not entirely fair to JPL. Whatever their "mindset" is, with it they
have developed technologies that have pushed the envelope and helped
everybody else. (Most recently Spacex with GFOLD but there are plenty of
others)

 

--

Ian M Garcia

 

  _____  

From: arocket-bounce@xxxxxxxxxxxxx <mailto:arocket-bounce@xxxxxxxxxxxxx>
<arocket-bounce@xxxxxxxxxxxxx <mailto:arocket-bounce@xxxxxxxxxxxxx> > on
behalf of Rand Simberg <simberg@xxxxxxxxxxxxxxx
<mailto:simberg@xxxxxxxxxxxxxxx> >
Sent: Wednesday, October 6, 2021, 10:27 PM
To: arocket@xxxxxxxxxxxxx <mailto:arocket@xxxxxxxxxxxxx
Subject: [AR] Re: big rockets





If they don't, they'll be out of business, because their one-off robots will
be greeted by hundreds of others when they arrive. Just as the first
astronauts to get to the Moon The NASA Way in Apollo redux will be greeted
by the concierge at the Luna Hilton.

On 10/6/21 19:23, Robert Steinke wrote:

+1

 

When I was at JPL as Spirit & Opportunity were winding down and Curiosity
was winding up people would say things like we can't just do another Spirit
& Opportunity because we want capability X (like the ability to reach a
specific location) so we need technology Y (like hypersonic guidance or long
distance autonomous driving).

 

I would ask have you looked at the probability of success of a shotgun
approach of sending N Spirit & Opportunities where you only need one to
succeed, and compared the cost of that to the development cost of a brand
new design that you will only ever make one of?

 

People didn't like when I asked that, especially the people who had spent
their careers developing technology Y. 

 

I think some universities and nonprofits will do amazing things when IMLEO
becomes (relatively) cheap, but I would not be optimistic about JPL making
the paradigm shift. 

 

On Wed, Oct 6, 2021 at 5:17 PM Rand Simberg <simberg@xxxxxxxxxxxxxxx
<mailto:simberg@xxxxxxxxxxxxxxx> > wrote:

Decades ago, I was talking to people at JPL about massively parallel
exploration with mass-produced rovers. But they couldn't break out of the
one-off mindset. And imagine what we're going to do sending flocks of
cubesats with motherships to the ocean moons. Yuri Milner may actually be
planning that for Enceladus. I put a bug in Pete's ear about that. 

On 10/6/21 16:33, Doug Jones wrote:

I wrote the following last year-

I think most people don't see the revolution that SpaceX's Starship will
usher in. Most of the extreme cost of those Mars missions was in the
non-recurring expense of building low mass bleeding-edge one-off hardware.

When you can put 100 tons into LEO for a few million dollars, most of that
goes out the window. Rovers will be bulky, have four times the mass, and
look like something out of Junkyard Wars. They can be built in groups of
5-10 for pennies on the dollar.

Computer array? Build a 5x redundant system using standard rack mount
hardware and put it in a pressure can with tungsten shielding to get the
single event upset rate down to something that can be handled routinely.

Cameras? Get a few top-of-the-line mirrorless DSLRs, put them in another
pressure can with a good window, done. Sure it has ten times the mass of the
exquisitely optimized jewelry on Perseverance, but who cares?

RTGs? Just put huge solar arrays on the rover. Massive things, overbuilt,
rugged, with built-in compressed gas nozzles to blow the dust off as needed.
A vacuum pump feeds an oilless air compressor- or rather, two of each. Maybe
a robotic arm with a whisk broom. Or both systems.

Drive train? Baja Rally buggy with major parts machined down to add a little
lightness but not too much. Install boots over the articulated sections to
keep the dust out. Send the vehicles in pairs with winches and tow straps.

Lather, rinse, repeat. Much smaller university consortia, working with
existing smallsat builders, can go wild. With delta-V to (literally) burn,
missions to the outer planets won't take a freaking decade to get there,
either.

Brute force all the way. It'll be glorious.

 

On Wed, Oct 6, 2021 at 5:05 PM Rand Simberg <simberg@xxxxxxxxxxxxxxx
<mailto:simberg@xxxxxxxxxxxxxxx> > wrote:

Actually, it's available now, but only for subcribers:
https://www.thenewatlantis.com/publications/walmart-but-for-space

It will be out from behind the paywall in a few weeks.

On 10/6/21 07:38, Rand Simberg wrote:

 I have an essay on this in the current issue of The New Atlantis. It should
be available on line soon.

On 10/6/21 06:28, Doug Jones wrote:

Perzackly. Who needs fancy-shmancy custom rad-hard featherweight
liquid-cooled vacuum-rated electronics when you can buy standard 19" rack
mount packages, put 'em in a steel pressure hull an inch thick with a
polyethylene liner to catch the secondaries, blow the cooling fans through a
flat plate heat exchanger, and call it good?

We're talking _literal_ battleship construction.

 

On Wed, Oct 6, 2021 at 1:22 AM J Farmer <jfarmer@xxxxxxxxxxxxx
<mailto:jfarmer@xxxxxxxxxxxxx> > wrote:

I think one of the points being overlooked, inadvertently or not, is the 
sea change that the shear lift capacity StarShip will in have in size 
and mass.  To date, every payload has to watch every kg, every cubic 
cm.  What happens when you can throw another cubic meter, lift another 
100kg mass at a problem?  How much time and money will be saved when you 
don't have to sweat that last one percent of your lift budget?

As Henry pointed out in an earlier thread about dealing with atmospheric 
& water leaks, with reliable lift schedules, just lift enough to 
replenish for several cycles while fixing the problem.  What changes in 
your planning when that supply run can be 50 or 100 tons of air or water?


John



 

Other related posts: